How to Prepare for Window and Door Replacement: A Simple Checklist

Replacing windows and doors is a big home project. While we work, parts of your home will be a work site. Getting ready is extremely important. It helps make the job safe, efficient and successful.

This guide tells you what to expect and what to do before installation day. Read it once, then use the checklists. What you need to do may vary depending on your project. If something does not fit your home, ask us.

What to expect

We protect and clean the area around each window or door we are replacing. This work area is about 3 to 5 feet (about 1 to 1.5 metres) around the opening. We also protect and clean the designated paths our team uses to come in and go out.

We do this only for these areas. The rest of your home is not part of our cleanup. That is why the checklist below asks you to move and cover your things.

A window with a floor area in front of it covered for protection, marked work area. A dashed arrow marked 3-5 feet runs from the window to a sofa wrapped in plastic.

The work area is about 3 to 5 feet around the opening. Furniture stays outside it.

While we work, you may notice

A loudspeaker icon for noise and vibration

Noise and shaking

You may hear construction noise and feel vibration.

A thermometer between a snowflake and a sun for temperature changes

Drafts

The temperature may change for a while, and you may feel drafts.

Dust particles in moving air

Dust

You may see dust and bits of material. Dust can spread, so cover your things.

A spray foam gun and can with fumes

Smells

Spray foam, caulking, glue and sealants can give off smells or fumes. They can last a short time after we finish.

What we are not licensed to work on

Window Mart is not licensed to work on:

  • Electrical work
  • Plumbing
  • Alarm systems
  • Heating and cooling systems (HVAC)
  • Vegetation management (plants, trees and bushes)
  • Weeping tile (the drain pipes by your foundation) or other exterior drains

Window and door replacement checklist

Please do these things before your installation day.

Inside your home

  • Move furniture and belongings at least 3 to 5 feet (about 1 to 1.5 metres) away from every place where we will work.
  • Cover sofas, chairs, mattresses, bedding and other soft items with drop sheets (big cloths) or plastic. This helps keep dust off them.
  • Take down or protect fragile items near the work areas. This includes art, mirrors, shelf decorations and light fixtures.
  • Temporarily clear or cover electronics and surfaces near each window or door opening.
  • Consider covering air vents or closing the doors between rooms. This helps limit dust.
  • Take down your blinds, curtains and window coverings, and put them back afterward. This is your job unless your sales agreement says otherwise.

Outside your home

  • Keep a clear parking space close to your home. Our team uses it to bring in tools and materials.
  • During winter conditions, make sure snow and ice are cleared at least 3 to 5 feet (about 1 to 1.5 metres) around every place where we will work and around all access points.
  • You must cut back, move or tie back flowers, gardens, trees and bushes, so we have clean and clear access to the windows.
  • Small or delicate flowers should be clearly marked and protected before we arrive.

People and pets

  • Plan for children, older adults, pets and anyone sensitive to dust, fumes, noise or temperature changes. This includes people with asthma or other breathing problems.
  • We strongly recommend that these people and pets stay away from the active work areas during installation.
  • Make sure all pets are secured and kept away from the work areas. This is for their safety and the safety of our crew.

Your alarm

  • Tell our installers about your alarm system.
  • Make sure your alarm company disconnects it before installation day.

 

If your alarm is still active or connected, we may have to book another day. Our installers are not responsible for disconnecting or reconnecting alarms.

Items that may apply to your project

Preparation requirements may vary depending on your specific project scope. If you are not sure, ask us.

  • Concrete cutting produces excessive dust, noise and vibration.
  • Soil: local rules say soil dug up during the work must stay on your property until it is tested and approved for disposal. You must choose a spot on your property to store it, or arrange for someone else to take it away after the work is done.
  • Door handle and deadbolt: if we are not supplying a new handle or lock for your door, you must supply a new handle and deadbolt, unless your sales agreement says otherwise. See our door hardware options.

After we finish

Once we finish in an area, we recommend opening windows or doors and running fans where practical.

Download the guide

Keep a copy for your installation day. Download Window Mart’s Home Preparation guide as a PDF, then print it or save it on your phone.